Plans in for £60m Stoke goods yard quarter

Aaron Morby 2 years ago
Share

Developer Capital & Centric has lodged plans to build a £60m urban quarter next to Stoke-on-Trent’s train station.

Bowmer & Kirklands is teed up as main contractor for the job
Bowmer & Kirklands is teed up as main contractor for the job

Plans for the Goods Yard, involve creating a mixed-use community for new homes, works spaces, shops, bars, cafes and a new public square at the Swift House site.

The project is advancing after receiving £16m from the Government’s Levelling Up Fund – one of three regeneration projects to benefit in Stoke-on-Trent up to the value of £56m.

Plans for the Goods Yard


  • The Goods Yard Living: Over 170 design-led flats for rent, with a mix of 1,2 and 3-bed homes. The new building is planned to feature private resident gardens, as well as resident facilities such as a café or bike repair shop, alongside other uses such as a gym or convenience store.

  • Signal Box: A café-bar in what is currently a derelict Network Rail signal box.
  • Vaults Warehouse: Restoration of the stunning, locally-listed, brick vaulted, below ground warehouse to create a combined work space and leisure venue.
  • Canalside Jetty: Opening up the water’s edge to the public and creating a potential mooring point for visiting canal boats or a water taxi.
  • The Pavilion: A contemporary building with an industrial feel that will provide 5,000sq.ft. of floor area for workspace and/or leisure uses.

  • The Goods Yard Square: A bustling public square at the heart of the site
  • Hotel: A 150-bed hotel (to be delivered as part of Phase 2)

Tim Heatley, co-founder of Capital & Centric, said: “We’ve been floored with the reaction from Stoke-on-Trent and the positivity shown for the Goods Yard. We’ve designed every inch of the site to create a genuine community, with design-led new homes surrounded by new public spaces, shops, work spaces, bars and cafes.”

Capital & Centric are working in partnership with Stoke-on-Trent City Council to bring forward the landmark project.

Cllr Abi Brown, leader of the city council, said: “Being successful with not one, not two but three bids to the Levelling Up Fund was a fantastic result for our city, and a real vote of confidence in the direction we are moving. The funding will turbo charge our regeneration plans and provide new jobs, homes and investment into our local economy.

“Obviously the Goods Yard was the focus of one of our successful Levelling Up Fund bids and it’s exciting that Capital & Centric have kept the momentum going by submitting their planning application.

“This is a HS2 connected site with a massive amount of potential, and one we have been pushing forward as a fantastic development opportunity to the market for the last four years.”

Project data



Landowner Stoke-on-Trent City Council
Development Partner Capital & Centric
Architect Glenn Howells Architects
Main contractor Bowmer + Kirkland
Landscape architect Re-form Landscape Architecture
Structural engineer Civic Engineers
M&E consultant JHP

 

Latest news

Greenwich University tenders £300m framework

Up to five firms will carry out upgrade and newbuild work at three campuses
53 mins ago

Gove puts another major building scheme on hold

Secretary of State starts another planning fight after M&S defeat
17 hours ago

Delancey submits £400m King’s Cross lab plans

200,000 sq ft lab/office project will be built above railway and tube tunnels just 4.5m below
14 hours ago

Sellar plans £500m City tower next to Walkie-Talkie

Consultation starts on London 60 Gracechurch Street tower
22 hours ago

Severfield ends year on high with record order book

Orders top £500m with strong future pipeline of opportunities ahead
23 hours ago

Second senior director exits National Highways

Commercial director Malcolm Dare set to move on to new role
23 hours ago

New scheme fuels London lab building boom

Plans in for 160,000 sq ft Whitechapel scheme near Royal London hospital
23 hours ago

Contract race starts for next £155m section of A9 dualling

Prior Information Notice published for Tay Crossing to Ballinluig stretch
2 days ago

£55m Sheffield build-to-rent scheme approved

Demolition to start later this year for 158-flat Sheffield Garden project
2 days ago

London back as most expensive place to build in world

Capital leapfrogs Geneva to top costliest construction rankings
2 days ago

Gas supplier Regent to buy TClarke for £90m

£491m turnover listed building services specialist to be sold
2 days ago

Steel contractor Billington launches into bridge market

Steelwork firm hires staff from failed architectural and bridge specialist SH Structures
2 days ago

McGee employees benefit from rise in profits

Pre-tax profit doubles boosting payouts for Employee Ownership Trust
2 days ago

Lendlease veteran is latest new McAlpine director

Paul Sims joins as Operations Director after 40 years at rival contractor
3 days ago

Costain signs site labour supply deal with four firms

Contractor to use only a quartet of providers for temporary labour supply
2 days ago

BAM go-ahead for Leeds 200,000 sq ft office

Latitude Yellow will complete final plot at Doncaster Monk Bridge site
3 days ago

VolkerFitzpatrick wins £30m logistics job

Latest deal to build five distribution units for Prologis UK
3 days ago

Trio win new Scape utilities consultancy framework

Perfect Circle, AtkinsRéalis and Arcadis win places on
2 days ago

Precast firm FP McCann cleared after immigration raid

Home Office takes no action after public raid on construction site
3 days ago

Wates-owned SES restructure delivers record profit and revenue

Building services contractor revenue soars to almost £300m
3 days ago

25 groundworks firms win £100m Places for People deal

M&J Evans, Carmac and Churngold Construction feature in housing association's line-up
3 days ago

Energy efficiency firms angry at lack of CITB support

SME contractors funding bid "does not meet the current criteria for supporting productivity or EDI"
3 days ago

£400m South Cambridge science park approved

Outline approval allows former sewage treatment works to be demolished
3 days ago

McLaren gets green light for 45-storey Leeds tower

Landmark Wellington Square scheme will see 464 flats built with 360,000 sq ft of offices
6 days ago

Heavy rain causes 1.9% construction output fall

Hopes remain undampened of a resi-led recovery this summer
6 days ago

Taziker restruture to return to profitability after £1.2m loss

Founders bought the business back from private equity after last year's loss
6 days ago

£220m London wharf homes scheme approved

285 homes to be built beside protected Albert and Swedish Wharves in Wandsworth
6 days ago

Major project veteran named civils director for Sizewell C

David Speight previously worked on Hinkley, Heathrow and HS2 client teams
6 days ago

Morgan Sindall lands £19m Milton Keynes hospital job

Crane lifts to be carefully co-ordinated to ensure air ambulance remains active
7 days ago

Clancy bolsters civils leadership team

Daniel Tonkin and Simon Hyams join as operation directors of water and infrastructure
7 days ago

Contractor services